I sent out a GIF diagram from my Visio drawing for the new cabling and connections for the CAO network expansion, to support the BAO and MODLs. This illustrated that we'd make a continuous run from the GBO switch to the BAO and new MODL switch. This also helped me understand the parts needed. I requested:
615 feet category 6 UTP (solid copper)
6 jacks (female) with 6 faceplates
8 plugs (male)
Waited for some feedback.
I also learned that we'd need a "punch down tool," for assembly the female jacks. Huh.