Sunday, October 16, 2016
worked at the work party
Helped at the fall work party at the Carr Astronomical Observatory. We replaced the large bed in the Cygnus room, prepared the site for the MODL 5, built a work station in the white light lounge, replaced the kitchen sink and faucet, a number of small, odd jobs, along with the seasonal tasks. I think everyone had a good time.
Labels:
volunteering
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment