Helped with part 2 of the locker build. We installed the doors and lighting. I made a short in locker 2, crimping a wire, which Phil and Tony traced. I was really pleased to participate with some sweat labour as opposed to just doing paperwork.
We didn't quite finish everything but Lora and Phil offered to attach the lock sets.
Sunday, July 20, 2014
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment