Friday, November 14, 2014

rebuilt the NEQ6

Rebuilt the NEQ6.

12:08 AM. Reassembled the Dec. Rebuilt the Dec worm gear.

Realised I missed a step while working on the RA worm, greasing the brass gear... Removed the motor and did it inside the motor cage.


1:18. Completed the RA assembly.

Reinstalled the altitude screws. The back one was very challenging to install without cross-threading! A lame design.

All motions felt smooth and solid. No play.

Need to reinstall the motor and do a run-up...

§

Lubricated with a calcium based, low temperature, water insoluable, water resistant, NLGI grade 2 grease.

No comments: