Rebuilt the NEQ6.
12:08 AM. Reassembled the Dec. Rebuilt the Dec worm gear.
Realised I missed a step while working on the RA worm, greasing the brass gear... Removed the motor and did it inside the motor cage.
1:18. Completed the RA assembly.
Reinstalled the altitude screws. The back one was very challenging to install without cross-threading! A lame design.
All motions felt smooth and solid. No play.
Need to reinstall the motor and do a run-up...
§
Lubricated with a calcium based, low temperature, water insoluable, water resistant, NLGI grade 2 grease.
Friday, November 14, 2014
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment