Wednesday, December 30, 2009

ready for skin

Got a few more steps done today, with supplies purchased yesterday. Had to use 2 pieces of 1/4" plywood for the roof base. Used PL Premium to glue the roof deck to the insulation; added a few long screws. Then added the self-adhesive ice shield to the roof deck. Added the lower hinge support. This allowed me to finally add the insulation on the back wall.



Measured the height of the new large casters and found them to be over 3.5 inches tall. I mounted 1 fixed and 1 rotating caster each to a 21" long 4x4. Did this twice.



Attached these wheel rails to the 3/4" base with adhesive and 6 long wood screws. Cut insulation to fit around the wheel supports.



Easier to work on it now. Added the insulation to the door 1/4" plywood with PL 2000. Thought I had cut it wrong but the insulation had shifted a little. Then I added ranch board with more PL Premium.



Didn't have enough to do it in one piece. It doesn't look like I'll have enough of the ranch board for the entire structure... And I've run out of time. I'll return in a few weeks to finish it.

1 comment:

Chas said...

Hey where is the toilet seat?

It's looking good dude..

chas