Sunday, May 26, 2013

a lot done

I was really proud of the work we accomplished over the work party weekend. A great crew. Very energetic. Hard working. Motivated. Made me and Tony look good.

For the Carr Astronomical Observatory spring work party, we accomplished a lot. Even though I had made a huge list, we crossed a lot of items...
  • replaced the south screen door
  • elevated and secured the GBO router and antenna
  • tested and inspected all fire and safety gear
  • moved the rocks and boulders near MODL 5 to ease lawn cutting
  • weather-sealed the picnic tables
  • installed cup hooks in supervisor closet for our keys
  • installed a large upstairs hall vent to improve flow to furnace
  • set up and checked Leslie's BBQ; retired the damaged propane BBQ to garage
  • packaged and moved the A/C furnace A-frame coil to garage
  • installed tool hooks and hangers in garage
  • assembled the new garden wagon with pneumatic tires
  • received replacement computer for living room
  • took garbage and junk to dump
  • dusted the walls and ceiling and artwork
  • steam-cleaned the carpets in the house
  • removed the storm windows
  • inspected the east window for regular service
  • removed the north storm door 
  • tuned-up ride-on lawn mower, including oil change, oil filter change, air filter inspection
  • refurbished the picnic tables placed about property
  • installed (custom red) LED solar lights
  • installed (repaired) canopy under pergola; built and installed a support post
  • de-energised the generator battery blanket circuit
  • inspected the furnace filter
  • performed grounds maintenance, thoroughly, including removing weeds from Observing Pad, GBO patio, south walk to the ramp, and the Great Room walk-out
  • cleaned stairs and downstairs walls of scuffs
  • from library, removed the old brown couch; installed new couch
  • power-washed deck and ramp along the north
  • assembled and filled the banker boxes
  • moved file cabinet in Orion room to library
  • moved library desk to improve utility
  • installed rough-in wiring along west wall of garage, for exterior outlets, and future lockers
  • installed breakers in garage panel
  • install GFCI outlets on garage exterior
  • moved outlet for router / switch; then moved router / switch
  • cupboards removed from Orion room
  • assembled mattress pen partition 
  • installed clothes line
  • removed old tree stump near BAO; set aside to dry
Amazing.

§

Photos from the work party are being loaded into the (private) RASC Toronto Centre Yahoo!Groups.

No comments: