Monday, October 12, 2009

CAO work

I did a variety of small jobs at the CAO:
  • dropped off spare parts for the solar lights (2 ground anchors, 2 shafts, 2 lenses)
  • retrieved the shed assembly manual(s); photographed parts; photographed pages for Tony and Charles
  • moved the electric kettle to a different kitchen circuit (again) to avoid overloading circuits
  • retrieved from the garage the winter storm barrier (frame and heavy plastic sheeting) for the double doors off the living room to the deck and secured in the frame; repaired tear in plastic sheeting
  • sent a note to the supervisor listserv for the next one up to bring a three-hole punch for the GBO forms
  • changed the low temperature alarm on the Davis weather station
  • arranged for the purchase of fuel stabiliser; stabilised fuel in 3 tanks
  • killed and vacuumed about 200 cluster flies
  • removed bees nests (2) from top of large propane tank
  • reported propane tank level
  • changed dial on water heater closet baseboard heater from F to C
  • set all baseboard heaters to 10°C; placed new stickers beside each thermostats
  • photographed the wiring from the GBO into the main panel for Tony
  • retrieved Dietmar's supervisor notes for return to city
  • inspected the comm. line entering the garage; seems to be 4 pairs...
Pretty light load.

No comments: