- dropped off spare parts for the solar lights (2 ground anchors, 2 shafts, 2 lenses)
- retrieved the shed assembly manual(s); photographed parts; photographed pages for Tony and Charles
- moved the electric kettle to a different kitchen circuit (again) to avoid overloading circuits
- retrieved from the garage the winter storm barrier (frame and heavy plastic sheeting) for the double doors off the living room to the deck and secured in the frame; repaired tear in plastic sheeting
- sent a note to the supervisor listserv for the next one up to bring a three-hole punch for the GBO forms
- changed the low temperature alarm on the Davis weather station
- arranged for the purchase of fuel stabiliser; stabilised fuel in 3 tanks
- killed and vacuumed about 200 cluster flies
- removed bees nests (2) from top of large propane tank
- reported propane tank level
- changed dial on water heater closet baseboard heater from F to C
- set all baseboard heaters to 10°C; placed new stickers beside each thermostats
- photographed the wiring from the GBO into the main panel for Tony
- retrieved Dietmar's supervisor notes for return to city
- inspected the comm. line entering the garage; seems to be 4 pairs...
Monday, October 12, 2009
CAO work
I did a variety of small jobs at the CAO:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment