Back in April, during the spring work party, Joel had bought the wood for me, as per my specifications. Tony had recommended untreated spruce.
Despite forgetting my notes at home, I built the table Saturday late-morning and afternoon. I neared completion as they launched rockets at the CAO Open House. After the Award Ceremony, I put the finishing touches on it. Carriage bolts in the legs primarily.
I'd like to thank the following people for assisting: Charles Darrow, Pat Gallo, Savio Gallo, Tony Horvatin, Shawn Lee, Scott Masterton, and Joel Parkes.
It was ready for dinner (during the CAO Open House)! Scott and I sat at it, specifically at the overhang end, so to test it. It works!
§
A couple of loose ends:
- put the end pieces on the table top
- finish with Thompsons Water Seal
- tighten up the carriage bolts later in the summer
- post warning notices at the overhang: "Do Not Sit."
- consider a temporary, swing-leg to prevent tipping, when someone does not read the warning...
No comments:
Post a Comment